2020-08-30
In modern life, automatic outdoor folding arm awning has become a very common modern construction equipment widely used in people's lives. Since it is often used, what kind of treatment measures should generally be carried out in the installation and construction process of the awning? The editor will give a detailed explanation on this point today.
1. The base layer of the waterproof sealing material must be flat, dense, damp, and clean enough. When there are stubbles on the surface of the base layer, it is generally necessary to use a wire brush to clean, and then brush with a cold base oil. When the cold base oil never sticks to your hands, fill in the waterproof sealing material again. When you encounter a blind seam, cut out the groove, brush with cold base oil, and insert the waterproof sealing material.
2. Generally, the waterproof sealing material should be short strips first, use force to insert it into the seam, and again use the caulking tool to compact the sealing material step by step to prevent gaps, separation and sagging, and then brush the surface with cold base oil again. , Compact and smooth. Note: Pay attention to the waterproof sealing material embedded in the balconies, sunshade boards, and side elevation gaps.
3. At this time, you need to pay attention to the awning board for the joints and the automatic outdoor folding arm awning to embed the sealing material in the cracks at the lower part of the wall, so no mistakes are allowed. Spread the mortar cap on the upper part of the seam; when making the second felt oil waterproof layer on the sunshade board, roll the linoleum along the wall root.
Exceeding is the treatment measures that should be brought to the attention of the constructors during the installation of the awning. It is hoped that it can provide assistance to the majority of friends, and the safety of the project can be prevented.
12-27
12-27
12-27
12-27
12-27
12-27
12-27
12-27
12-27
12-27